Description
Power Connection Kits are REQUIRED on Premium Zoneline Chassis. The correct kit for the installation is determined by the voltage and amperage of the electrical circuit and the means of connecting the unit to the building wiring. If the unit is to be plugged into a receptable, a line cord kit would be used; if the unit is to be permanently connected, a permanent connection kit would be used. 265 Volt cord set units must be installed in compliance with National Electrical Code.
Specifications
Weights & Dimensions
Approximate Shipping Weight:
1 lb
Power Connection Kit
Recommended Protective Device:
30 Amp Time Delay Fuse or Breaker
Features
230/208 Volt Power Connection Kit for Line Cord Connected Zoneline Packaged Terminal Units
Accommodates 5.00/4.09 Heater KW Rating, 5000/4090 Watts, 17000/13900 BTUH, 21.7/19.7 Amps on a Recommended 30 Amp Time Delay Fuse or Breaker
Genuine GE Part
One Year Warranty
California residents see
Prop 65 WARNINGS